Repair / Maintenance

 

                                                    before

 

 

 

 

 

 

  • The safety of your personnel and this of the load is our first priority when heavy lifting is on schedule.

  • Keeping track of the inspection appointments is therefore mandatory.

  • Send us your Jack, free shipping!
                                                    after

 

 

 

  • We carry out the yearly inspection in accordance with the BGV D8 conditions. This includes visual, crack and functional testing of the jack and renewal of the inspection sticker in case of compliance. 

  • Should it be determined that repair measures are necessary, you will receive an offer for the repair costs.

  • Restore your equipment to a reliable and safe condition. Your equipment leaves our workshop "as new" and you are on the safe side again.